Capital Projects Financially Closed/Cancelled as of 12/31/16

Draft – This page is currently under construction

Storrs & Regional Campuses:

  Project # Phase Approved Budget Actual Cost Primary $ Source
Advanced Technology Laboratory & White Building Elec. & Generator Modifications 201598 Cancelled 9/24/14 $605,000   $26,223  UCONN 2000, DM, Plant Funds
Agricultural Biotechnology & Advanced Technology Building Code Remediation Project 201409 Financially Closed 12/4/07 $964,307   Plant Funds
Aquatics Facility – Renovations to Atwater Pathobiology Building 201441 Financially Closed 6/24/08 $1,200,000 $1,149,782 Research Funds
Arjona and Monteith (new classroom buildings) 901126 Financially Closed 9/27/12 $95,000,000  $89,268,259 UCONN 2000
Arjona and Monteith Renovations – Arjona Renovations 901719 Financially Closed 12/12/12 $15,400,000  $14,963,142 UCONN 2000
Atwater Building – Roof Replacements 901673 Financially Closed 9/27/12 $600,000  $567,799 DM
Atwater Exterior Window Replacement 901397 Cancelled 4/24/13 $1,900,000   $36,915  DM
Atwater Laboratory Electrical Service 901633 Financially Closed 11/13/13 $785,000  $624,397 DM
Atwater Pathobiology Fire Alarm Replacement 901514 Financially Closed 6/23/09 $510,000  $348,359 Plant Funds
Avery Point Campus Undergraduate & Library Building – Phase I 901278 Financially Closed 4/25/12 $9,315,150  $9,190,863 UCONN 2000
Avery Point Campus Undergraduate & Library Building 58 Demolition 901650 Financially Closed 9/28/11 $570,000  $454,426 UCONN 2000
Avery Point Campus Undergraduate & Library Building – Roof and Exterior Building Envelope Masonry Repairs 901525 Financially Closed 8/4/09 $573,000   UCONN 2000
Babbidge IT & Phone Functional Areas – Heating & Air Conditioning and Electrical Repairs 901580 Financially Closed 6/28/12 $2,200,000  $1,957,652 DM & Departmental
Backfeed Loop – North Eagleville to Parking Garage to Storrs Road 901416 Cancelled 12/12/12 $300,000  $222,254  DM
(Werth Family) Basketball Champions Center 201434   2/25/15 $35,535,800  $35,483,332 Departmental, Operating, Gifts
Beach Hall Renovation of Rooms 245 & 246 901254 Financially Closed 9/22/09 $970,000   DM & Operating
Beach Hall Renovations – Facade and Roof Repair 901646 Financially Closed 8/8/12 $2,500,000  $2,267,695 UCONN 2000
Beach Hall Renovations – MCB Lab for New Faculty 901773 Financially Closed 12/11/13 $1,615,574  $1,247,588 UCONN 2000
Beach Hall /Renovations – Phase I 901273 Financially Closed 4/21/09 $1,500,000   UCONN 2000
Benton State Art Museum Addition 901263 Financially Closed 9/21/10 $1,350,000   UCONN 2000
Benton State Art Museum Addition – Mechanical System Improvements 901545 Financially Closed 9/21/10 $2,150,000  $1,643,528 UCONN 2000
Biobehavioral Complex Replacement (Renovation) 901380 Financially Closed 11/10/11 $3,000,000  $2,589,140 UCONN 2000
Bishop Renovation 901387 Cancelled 4/13/11      
Bishop Renovation – Various Improvements for Academic & Student Services Activities 901645, 901743 Financially Closed 9/13/12 $2,425,000

 $2,216,499

UCONN 2000 & Equipment
Budds Building Window Replacement 901377 Cancelled 12/12/12 $1,315,000   $23,362  DM
Castleman Building Drainage 901289 Financially Closed 9/28/11 $550,000  $506,131 DM
Central Utility Plant Emergency Generator System 901197, 901194, 901195 Financially Closed 1/12/09 $2,000,000   DM
Charter Oak Corrective Action Plan – Phase II 201399 Financially Closed 9/26/06 $860,000   Plant Funds
Charter Oak Suites Attic Sprinklers Installation 201323 Financially Closed 11/14/06 $1,000,000   Plant Funds
Code Remediation and Renovations – Ratcliffe Hicks Arena 901352 Financially Closed 6/10/10 $998,650  $966,416 DM & Departmental
Code Safety Inspections Summer 2007, corrective action 901262 Financially Closed 9/25/07 $2,200,000   DM
Community Professional Building Renovation – Avery Point Campus 201543 Financially Closed 8/3/11 $1,358,165  $1,349,175 UCONN 2000, Research/Grant
Compost Facility 901268 Financially Closed 6/23/09 $670,000   DM
CSST Gas Piping Replacement 901515 Financially Closed 6/23/09 $550,000  $208,886 Departmental Funds
Depot Store House – Roof Replacement 201514 Financially Closed 6/10/10 $637,000  $552,699 Departmental Funds
East Campus Steam & Condensate Piping Replacement at Avery Point Campus 901198 Financially Closed 4/15/08 $2,085,000   DM
Ecology and Evolutionary Biology Greenhouse Renovations 201583 Financially Closed 4/23/14 $1,000,000  $264,200 University Funds
Facilities Condition Analysis 901170 Financially Closed 5/15/06 $800,000   DM
Facilities Operations Code Remediation, Infrastructure Upgrades & Reorganization Alteration 201639 Financially Closed 10/29/14 $990,000  $814,321 University Funds
Family Studies (DRM) Renovations – Elevator Replacement 901365 Financially Closed 3/10/09 $787,500   UCONN 2000
Family Studies Windows 901293 Financially Closed 6/23/09 $2,193,240  $1,920,067 UCONN 2000
Farm Buildings Repair/Replacement – Roof, Façade and Other Repairs 901366 Financially Closed 9/23/08 $2,000,000  $1,149,594 UCONN 2000
Fats, Oil and Grease Compliance – Phase I 201623 Financially Closed 6/25/14 $2,000,000  $1,596,054 University Funds
Fine Arts Building Envelope Repair 901604 Cancelled 12/12/12 $600,000   $42,735 DM
Fine Arts Gateway and Pedestrian Access 901812 Financially Closed 4/23/14 $1,500,000  $1,350,137 DM
Fine Arts Phase II – Core Building 901567 Cancelled 8/3/11 $1,200,000     UCONN 2000
Fine Arts Phase II – Master Plan 901369 Financially Closed 8/4/09 $1,050,000   UCONN 2000
Fine Arts Phase II – Photo Lab Ventilation Improvements 901544 Financially Closed 11/5/09 $700,000  $541,947 UCONN 2000
Fire Alarm Upgrade in the Graduate Student Residences 901271 Financially Closed 12/4/07 $754,948   DM
Fire Alarm Upgrade in the West Campus Residences 901270 Financially Closed 12/4/07 $498,273   DM
Floriculture Greenhouse 901367 Financially Closed 8/7/13 $6,832,300  $6,763,949 UCONN 2000 & Departmental
Gant Building Renovations – Immediate Exterior Repairs 901753 Financially Closed 9/27/12 $8,570,000  $7,723,461 UCONN 2000
Gampel Pavilion LED Lighting and Controls Upgrade 201652 Financially Closed 9/24/14 $546,000   University Funds -Renewable Energy Credits
Gant Building Renovations – Mechanical Repairs 901769 Financially Closed 4/23/14 $600,000  $138,002 UCONN 2000
Gant Building Renovations – Phase1 901562 Financially Closed 11/5/09 $560,000  $382,705 UCONN 2000
Gant Building Renovations – Phase I (Roof) 901374 Financially Closed 2/22/11 $2,310,000  $513,492 UCONN 2000
Gant IMS Fire Alarm Replacement 201502 Financially Closed 2/22/11 $1,372,000  $1,265,594 DM & Plant Funds
Garrigus Suites – Rear Stairway Repair 901749 Financially Closed 9/27/12 $1,000,000  $7,123 DM
Gentry Completion 901280 Financially Closed 4/21/09 $10,000,000  $9,628,209 UCONN 2000
Gulley Hall Drainage 901407 Cancelled 12/12/12 $400,000    DM
Gulley Hall Roof and Structural Repair 901181 Financially Closed 12/4/07 $630,000   DM
Hall Dorm Ground Floor Restoration 901560 Cancelled 12/12/12 $770,000   $46,587 DM
Hawley Armory Facade and Interior Repairs 901182 Financially Closed 4/15/08 $2,720,000  $2,274,299 DM
Heating Plant Upgrade – Boiler Reliability Improvements 901695 Financially Closed 8/7/13 $840,000  $489,545 UCONN 2000
Heating Plant Upgrade – Cogeneration Facility 900886 Financially Closed 4/12/05 $81,900,000  $24,835,349 Lease
Heating Plant Upgrade – Improve Condensate Return System 901698 Financially Closed 9/25/13 $1,450,000  $1,407,352 UCONN 2000
Hilltop Apartments Correction Action Plan 201315 Financially Closed 8/2/05 $14,874,500  $206,792 Plant Funds
Hilltop Apartments Corrective Action Plan – Phase II 201368 Financially Closed 6/20/06 $9,700,000   Plant Funds
Hilltop Apartments Corrective Action Plan – Phase III 201405 Financially Closed 12/4/07 $977,252   Operating Funds
Historic House Renovations 901432 Cancelled 12/12/12 $1,400,000   $196,291 DM
Homer Babbidge Library – Replace Floor Coverings 901715 Financially Closed 4/24/13 $1,000,000  $776,623 DM
Human Development Building Parking Lot 901378, 901418 Financially Closed 6/23/09 $505,000   DM
Installation of Filter Press 901368 Financially Closed 6/23/09 $850,000  $769,331 DM
Interior Remediation, Demolition & Removal of Pharmacy Buildings 901172 Financially Closed 6/19/07 $1,105,832   DM
Intramural, Recreational & Intercollegiate Facilities 201188 Financially Closed 9/26/06 $48,777,660   UCONN 2000
Jorgensen Renovation – Auditorium Seating Replacement 901553 Financially Closed 11/9/10 $2,162,000   DM, Operating & Gifts
Jorgensen Renovation – Fire Alarm Replacement 901506 Financially Closed 4/21/09 $825,000  $823,004 UCONN 2000
Jorgensen Renovation – Phase I 901274 Financially Closed 4/21/09 $1,375,000  $1,261,471 UCONN 2000
Koons Hall Renovation/Addition – Windows, Facade and Mechanical 901379 Financially Closed 6/23/11 $1,200,000  $1,080,057 UCONN 2000
Lakeside Renovation 901105 Financially Closed 4/11/06 $5,237,231  $1,435,200 UCONN 2000
Landfill Closure 900748 Financially Closed 6/23/09 $28,123,049  $26,971,924 DM
Law School Renovations/Improvements – Facade Restoration 901169 Financially Closed 3/23/10 $20,330,113  $7,980,240 UCONN 2000 & State Bonds
Law School Renovations/Improvements – Hartranft Elevator 901131 Financially Closed 8/2/05 $1,095,600  $82,775 UCONN 2000
Law School Renovations/Improvements – Knight Hall Room 215 Classroom Renovation 901589 Financially Closed 9/28/11 $575,000  $401,760 UCONN 2000
Law School Renovations/Improvements – Starr, Chase & Knight Halls Envelope Repair 901188 Financially Closed 2/28/12 $3,000,000  $2,500,189 UCONN 2000
Lightning and Grounding Protection for Hilltop Apartments and Charter Oak Suites 901350 Financially Closed 6/23/09 $715,000  $411,973 Departmental Funds
Main Water Supply Line Replacement Phase I 901634 Financially Closed 6/25/14 $7,000,000  $3,295,408 DM
Manchester Hall Renovation – Envelope repairs (Window Replacement) 901644 Financially Closed 3/28/12 $850,000  $584,765 UCONN 2000
Mansfield Apartment Bathrooms – Phase II 201641 Financially Closed 4/23/14 $500,000  $377,565 University Funds
Mansfield Road Realignment 901206 Financially Closed 4/20/10 $2,100,000  $1,756,910 DM & Plant Funds
Mansfield Training School – Existing Condition Surveys & Master Planning 901370 Financially Closed 6/24/08  $600,000    UCONN 2000
Mansfield Training School Improvements – Merritt Building 901213 Cancelled 9/24/14 $3,250,000   $371,187 UCONN 2000
Mansfield Training School Improvements – Longley Renovations 901281 Cancelled 9/25/07 $1,000,000   $13,241 UCONN 2000
McMahon Dining Hall Renovations 201357 Financially Closed 1/25/12 $9,900,000  $9,430,158 UCONN 2000 & Departmental Funds
McMahon Kitchen Alterations 201634 Financially Closed 12/10/14 $885,935  $706,306 University Funds
Memorial Stadium Demolition 201586 Financially Closed 4/25/12 $800,000  $432,149 Gifts
Meter Installation  – Multiple Locations 901193 Financially Closed 9/26/06 $600,000   DM
Meter Installation – Multiple Locations  (Phase II) 901326 Financially Closed 1/22/08 $600,000  $551,404 DM
Meter Installation – Multiple Locations  (Phase III) 901371 Financially Closed 6/23/09 $600,000  $469,538 DM
Microgrid Research Program at the Depot Campus 201635 Financially Closed 12/11/13 $3,000,000   University Funds; Grant Funds
Mirror Lake Dredging and Related Improvements 901392 Cancelled 12/12/12 $3,400,000   $214,340  Operating, DM
Natural History Museum Completion 901124 Financially Closed 9/26/06 $1,022,997  $499,669 UCONN 2000
Nayden Clinic Relocation 901166 Financially Closed 8/21/08 $892,000   DM
New Faculty Renovations – White Building, Animal Science Lab 901757 Financially Closed 12/11/13 $1,865,000  $1,584,189 DM
New 16″ Water Main – Towers to Glenbrook and North Eagleville 901422 Financially Closed 4/20/10 $2,300,000  $1,890,196 DM
North Hillside Road Tennis Courts 201316 Financially Closed 8/2/05 $900,000   Departmental Funds
Old Central Warehouse 901266 Withdrawn 8/3/11 $2,126,000  $126,000 UCONN 2000
OSFM Code Remediation: Babbidge Library Emergency Lights 901801 Financially Closed 6/25/14 $4,000,000  $2,008,969 UCONN 2000
OSFM Fine Arts Complex Code Correction 901175 Financially Closed 6/23/09 $957,738  $886,987 Plant Funds
OSFM Law School Code Remediation – Hosmer (Chase) Hall 901249 Financially Closed 1/12/09 $590,000  $544,502 DM
OSFM Legacy Code Remediation 901259 Financially Closed 1/26/11 $9,000,000  $8,845,365 DM
Parking Garage Repair and Upgrade 901410 Financially Closed 4/21/09 $1,305,000   DM
Pedestrian Safety Improvements – Core Campus Phase I 901577, 901734, 901735 Financially Closed 4/24/13 $6,591,000  $3,420,209 UCONN 2000
Pedestrian Safety Improvements – CUE/Gentry Corridor 901627 Financially Closed 8/3/11 $1,240,350  $407,823 DM
Pedestrian Safety Improvements – Hillside Road 901726 Financially Closed 9/27/12 $3,000,000  $2,730,270 DM
Phase I of the Fire Alarm Upgrade Project 901174 Financially Closed 6/20/06 $2,300,000  $378,635 DM
Phillips Communication Building Air Distribution and Lighting System 901902 Financially Closed 2/24/16 $1,1000,000   UCONN 2000
Psychology Building Renovation/Addition 901388 Financially Closed 4/25/12 $25,170,550  $1,014,403 UCONN 2000
Psychology Fire Alarm Replacement 201495 Financially Closed 6/23/09 $506,000  $497,046 Plant Funds
Public Safety Complex Improvements 201574 Financially Closed 8/3/11 $3,000,000  $79,146 University Funds
Public Safety Security Garage and Storage Facility 901384 Financially Closed 6/23/09 $568,311  $542,877 DM
Recreational Sport Field Repair/Replacement – Depot Campus 201439 Financially Closed 4/20/10 $1,167,900  $1,088,720 Departmental Funds
Renovations for New Faculty – Pharmacy Biology Building 901730 Financially Closed 6/28/12 $1,300,000  $1,105,568 DM & Departmental
Renovations of Longley Building for Additive Manufacturing Research 901731 Financially Closed 6/28/12 $800,000  $747,469 DM & Departmental
Repair & Renovation of Avery Point Pool & Gym Facility 901173 Financially Closed 5/14/07 $3,145,273   DM
Repair & Renovation of the Sherman Athletic Complex 901243 Financially Closed 1/22/08 $2,641,824   DM & Departmental
Repair of Water Tank #2 901652 Financially Closed 9/27/12 $1,700,000  $1,277,465 DM
Replace Gampel Chillers 901869 Financially Closed 6/24/15 $1,446,000   UCONN 2000
Replacement of Chemical House (Well Water Treatment Facility) 901320 Financially Closed 11/5/09 $3,500,000  $2,951,874 DM
Replacement of Two Water Towers 901311 Financially Closed 4/21/09 $2,500,000  $2,094,618 DM
Residential Life Facilities – Brock, Russell and Batterson Halls Shower Improvements 901934 Cancelled 3/25/15 $630,000  $9,529 UCONN 2000
Residential Life Facilities  –  Connecticut Commons Renovation 201554 Financially Closed 8/3/11 $6,250,000  $5,019,350 UCONN 2000, Departmental Funds
Residential Life Facilities – Hale and Ellsworth Halls Elevator Replacement 201511 Financially Closed 4/20/10 $2,140,000  $1,240,920 Departmental Funds
Residential Life Facilities – Holcomb, Whitney, Sprague Masonry Repairs 901471 Financially Closed 6/10/10 $800,000   Departmental Funds
Residential Life Facilities – Husky Village Housing Complex Heating Upgrades 901871 Financially Closed 12/10/14 $600,000  $569,099 UCONN 2000
Residential Life Facilities – McMahon Elevator Replacement 201512 Financially Closed 11/9/10 $2,202,000  $1,220,202 University Funds
Residential Life Facilities – Shippee Hall Elevator Replacement 901449 Financially Closed 11/18/08 $600,000   UCONN 2000
Residential Life Facilities – South Campus Envelope: Architectural Precast Stone Repairs 901833 Financially Closed 4/23/14 $4,500,000  $4,407,974 UCONN 2000
Residential Life Facilities – South Campus Envelope – Gable Repairs & Protective Work 901813 Financially Closed 6/3/14 $3,000,000  $1,624,489 UCONN 2000
Residential Life Facilities – Sprinkler Installation & Miscellaneous Repairs at Mansfield Apartments 901284 Financially Closed 6/23/09 $4,000,000   Departmental Funds
Residential Life Facilities – Sprinkler Installation & Miscellaneous Repairs at Northwood Apartments 901283 Financially Closed 6/23/09 $3,000,000  $2,623,293 Departmental Funds
Residential Life Facilities  – Hale and Ellsworth Exterior Masonry Repairs 901710 Financially Closed 4/24/13 $2,000,000  $992,612 UCONN 2000
Residential Life Facilities - West Campus Shower Renovations 901949 Financially Closed 6/29/16 $2,360,000   UCONN 2000; University Funds
Residential Life Facilities – Whitney Hall Renovations 901908 Financially Closed 12/10/14 $685,000  $681,864 UCONN 2000
Residential Life Facilities – Window Replacement Graduate Residence Halls 201524 Financially Closed 2/18/10 $2,300,000   Departmental
Residential Life Facilities – Window Replacement Project for Grange Hall, Hicks Hall, Shippee Dining Facility and Northwood Complex 201555 Financially Closed 4/24/13 $3,990,000  $3,882,432 UCONN 2000 & Departmental
Residential Life Facilities – Window Replacement Project For Holcomb, Whitney, Sprague, Shippee Grad Dorms and Northwood Apartments 901450 Financially Closed 6/23/09 $2,000,000   Departmental
Residential Life Window Replacement Project for Alumni Quad and Buckley Hall 201438 Financially Closed 4/15/08 $2,100,000   Departmental
Residential Life Window Replacement Project for Hale Hall, Ellsworth Hall, West Campus and McMahon Hall 201309 Financially Closed 11/18/08 $3,071,600   Departmental Funds
Roads, Sidewalks and Miscellaneous Repairs – Phase III 901618 Financially Closed 1/26/11 $850,000  $90,558 DM
Rodent Barrier Facility 201582 Cancelled 4/24/13 $2,400,000   $152,112 Research
Roof Repair & Rehabilitation – Monteith Hall 901155 Financially Closed 11/15/05 $250,000   DM
Rt 195 Sewer Line Replacement – Area 1 201558 Financially Closed 4/13/11 $550,000  $300,791 Operating
Ryan Refectory Renovations 901167 Financially Closed 11/14/06 $2,970,000   DM
SCADA (Supervisory Control and Data Analysis) System 901196 Financially Closed 1/22/08 $1,300,000   DM
School of Engineering Renovations 901508 Financially Closed 2/18/10 $1,411,000  $1,203,348 DM, Departmental, Eminent Faculty
School of Pharmacy/Biology Completion 900330 Financially Closed 1/31/06 $94,609,000  $93,204,049 UCONN 2000
Security Upgrades – Hilltop Apartments 201505 Financially Closed 6/10/10 $967,000  $623,372 Departmental
Sewage Treatment Plant Clarifier Repairs 901192 Financially Closed 2/27/08 $1,190,000   DM
Shippee Dining Hall Renovations 201545 Financially Closed 9/27/12 $4,000,000  $3,884,592 Departmental Funds
Small Capital Projects Fund 901693 Financially Closed 9/28/11 $1,500,000  $1,249,669 DM
South Campus Express Line Modifications (Water & Sewer Distribution) 901316 Cancelled 12/12/12 $360,000    DM
South Campus Fire Alarm Upgrade 901269 Financially Closed 4/15/08 $667,085   DM
South Garage Slope and Ramp Repair 901178 Financially Closed 4/20/10 $607,200  $478,363 DM
Stamford Campus Carpet Replacement 901334 Financially Closed 12/4/07 $657,504   Operating Funds
Stamford Campus Improvements – Parking Garage Repairs 901090 Financially Closed 6/19/07 $435,000  $18,676 UCONN 2000
Stamford Parking Garage Repair and Maintenance Program 901583 Financially Closed 4/20/10 $1,962,434  $1,569,215 DM
Steam & Condensate Distribution System Replacements – Phase I 901317, 901372, 901421 Financially Closed 9/21/10 $4,014,537  $3,924,663 DM
Storrs Hall Addition 901265 Financially Closed 4/13/11 $14,825,000  $14,180,268 UCONN 2000 & Departmental
Storrs Hall Addition – Windows and Exterior Repairs 901575 Financially Closed 1/26/11 $740,000  $612,927 UCONN 2000
Street Construction/Sidewalk Repairs and Related Improvements – Phases l & ll 901318 Financially Closed 6/23/09 $2,600,000   DM
Student Union Addition 900576 Financially Closed 6/20/06 $70,755,303  $12,519,120 UCONN 2000
Student Union Quadrangle Site Work and Landscape-Phase l 901101 Financially Closed 6/19/07 $1,400,000   DM
Student Union Quadrangle Site Work and Landscape-Phase ll 901440 Financially Closed 11/9/10 $1,150,000  $1,113,367 DM
Support Facility (Architectural and Engineering Services) 901390 Cancelled 12/12/12 $500,000    UCONN 2000
Tie in Drum Heater on Boilers at CUP (Central Utility Plant) 901319 Financially Closed 8/3/11 $104,500  $78,059 DM
Torrey 1st Floor East Renovations 901572 Financially Closed 11/9/10 $3,500,000  $3,187,970 DM, Research, Departmental Funds
Torrey Life Sciences Code Correction 901260 Financially Closed 12/4/07 $500,000   DM
Torrey Life Sciences Fire Alarm Replacement 201503 Financially Closed 11/9/10 $587,000  $573,566 University Funds
Torrey Life Sciences Relocation 901158 Financially Closed 9/20/05 $645,000  $75,000 DM
Torrey Renovation Completion & Biology Expansion - Roof Replacement 901806 Financially Closed 9/24/14 $1,012,500  $789,068 UCONN 2000
Torrington ADA Improvements 901201 Financially Closed 6/19/07 $650,000   DM
Torrington Campus Improvements 901375 Financially Closed 8/10/10 $340,000  $320,874 UCONN 2000
UCFM Code Remediation: Charter Oak Apartments 901476 Financially Closed 4/20/10 $537,000  $475,578 University Funds
UCFM Code Remediation: Charter Oak Apartments – 3rd Floor Attic Sprinklers 201542 Financially Closed 4/20/10 $1,387,000   Departmental
UCFM Code Remediation: Gampel Pavilion Fire Alarm Replacement 901552 Financially Closed 4/20/10 $2,200,000  $747,549 DM
UCONN 2000 Code Remediation: North Campus Dormitories 201478 Financially Closed 201478 $1,085,000  $770,114 University Funds
Waterbury Campus Property Transfer (Old Campus) 901097 Financially Closed 9/22/09 $1,180,000  $648,275 DM & Departmental
Waterbury Downtown Campus –  Courtyard Landscaping and Art Work 901179 Financially Closed 3/23/10 $934,100  $500,000 UCONN 2000 & Gifts
Water Reclamation Facility 901229 Financially Closed 1/26/11 $28,951,000  $28,743,125 University Funds
West Hartford Campus Renovations/Improvements – 1800 Asylum Boiler Replacement 901538 Financially Closed 4/13/11 $850,000  $699,218 UCONN 2000
West Hartford Campus Renovations/Improvements  – Chemistry Lab 901569 Financially Closed 9/21/10 $1,469,000  $1,466,129 UCONN 2000
West Hartford Campus Renovations/Improvements – Electrical Switchgear Replacement 901286 Financially Closed 2/28/12 $1,024,700  $960,465 UCONN 2000
West Hartford Campus Renovations/Improvements – Parking Lot 901110 Financially Closed 8/2/05 $850,000  $350,000 UCONN 2000
West Hartford Campus Renovations/Improvements – Phase l 901285 Financially Closed 6/10/10 $1,400,000  $1,284,018 UCONN 2000
West Hartford Campus Renovations/Improvements – Replace Trecker Library Air Handling Unit 901539 Financially Closed 6/10/10 $525,000  $40,208 UCONN 2000
West Hartford Campus Renovations/Improvements – School of Social Work Building Envelope 901524 Financially Closed 9/22/09 $1,000,000  $905,639 UCONN 2000
West Hartford Campus Renovations/Improvements – Student Lounge and Office Relocation 901568 Financially Closed 2/22/11 $839,000  $795,149 UCONN 2000
Whetten Renovations & Code Remediation 201640 Financially Closed 12/10/14 $710,000  $587,492 UCONN 2000; University Funds
Wilbur Cross Facade Repairs 901185 Financially Closed 4/15/08 $1,754,500   DM
Willimantic River Water Transmission Line – Partial Replacement 901062 Financially Closed 9/26/06 $712,819   DM
Wood Hall Facade Repair 901601 Financially Closed 6/23/11 $1,000,000  $826,628 DM
             

UConn Health:

Project #

Phase

Approved

Budget

 Actual Cost

Primary $ Source

800 Mhz NMR Installation 08-014 Financially Closed 11/5/09 $2,900,000 $2,782,989  UCH Capital & Grant Funds
Academic Building (Bldg. A) Roof Replacement 07-601.10 Financially Closed 4/13/11 $725,000 $622,844  DM
Academic Research Building Heat Pipe Replacement 08-601.01 Cancelled 12/12/12 $1,250,000     DM
Administrative Services Building Renovation to Medical Services Building 04-6521 Cancelled 12/12/12 $18,000,000     UCH Capital
Cooling Coil Conversion 06-704 Financially Closed 12/4/07 $1,408,000 $1,406,703  DM
Cooling Tower Replacement   Financially Closed 9/20/05 $1,818,600   DM
CT Simulator – High Dose Radiation Renovations 10-059 Financially Closed 12/12/12 $1,715,000 $1,169,547  UCH Capital
Datacenter Infrastructure Improvements 09-603.01 Financially Closed 4/20/10 $2,055,000 $1,981,943  DM
Demolish Lower Research Campus 12-010 Financially Closed 9/27/12 $850,000 $752,005  UCH Capital
Demolition of Dowling North and Dowling South Buildings 14-604 Financially Closed 12/10/14 $1,295,000 $856,833  DM, Jackson Labs
Dental Clinic Fit Out, Storrs Center 13-023 Financially Closed 1/29/14 $925,000 $857,797  UCH Capital
Dental Implant Center Renovation 06006938 Financially Closed 9/25/07 $2,555,000 $2,439,540  UCH Capital
Dental School CONNcept Clinic Renovation 10-070 Financially Closed 4/13/11 $1,000,000 $639,050  UCH Capital
Dental School Renovation – Grasso Phase III – 24/7 Student Lab 10-053 Cancelled 12/12/12 $485,000    UCH Capital
Dental School Renovation – Orthodontics Renovation 901526 Cancelled 12/12/12 $2,290,000   $70,323  UCONN 2000
Dental School Renovation – Preclinical Teaching & Prosthetics Labs 901212 Financially Closed 2/18/10 $2,420,000  $2,138,939 UCONN 2000
Detention Basin Dredging 08-602.01 Financially Closed 9/27/12 $990,000 $887,155  DM
Dowling North Renovation 07-070 Cancelled 12/12/12 $905,000     UCH Cpait
Dowling South Chiller Replacement 09-019 Financially Closed 2/18/10 $690,000   UCH Capital
Electric Heat Conversion Project 07-604 Financially Closed 2/27/08 $1,620,000 $1,473,686  DM
John Dempsey Hospital 2nd Floor – ICU Renovation   Cancelled 12/12/12 $1,546,000     UCH Capital
John Dempsey Hospital 4th Floor Renovation   Cancelled 12/12/12 $800,000    UCH Capital
John Dempsey Hospital Electro Physiology Lab & Catheterization Lab Renovation, Phase I and II   Financially Closed 4/11/06 $5,205,000 $5,142,470  UCH Capital
John Dempsey Hospital Emergency Department Expansion 07-038 Financially Closed 3/10/09 $1,280,000 $1,064,134  UCH Capital
Library/Student Computer Center Renovation 901223 Financially Closed 4/15/08 $1,216,491  $1,020,572 UCONN 2000 & Gifts
Main Building Exterior Facade Joint Sealant Replacement 08-603.01 Financially Closed 2/27/13 $3,475,000 $2,820,666  DM
Main Building Renovation – Clinical Skills Renovation 901211 Financially Closed 4/10/07 $1,400,000  $1,025,655 UCONN 2000
Main Cooling System Back – Up Chiller Replacement 6006894 Financially Closed 2/27/08 $935,000 $880,765  DM
Medical Arts and Research Building Lab Fit – Out 07-009 Financially Closed 3/13/07 $560,000 $550,800  UCH Capital
Medical School Academic Building Renovation – Patterson & Massey Auditoria 901136 Financially Closed 9/26/06 $4,350,000  $3,697,487 UCONN 2000
Munson Road Reconfiguration-Phase l   Financially Closed 1/31/06 $2,100,000 $2,065,902  UCH Capital
Negative Pressure Room – Building 4 Renovations 07-082 Financially Closed 11/18/08 $590,000 $489,521  Research Funds
Research Tower 901132 Financially Closed 9/21/10 $49,565,000  $49,248,989 UCONN 2000
Support Building Addition/Renovation 5006797 Cancelled 12/12/12 $7,800,000    UCONN 2000
Tomotherapy Equipment Installation 05006842 Financially Closed 3/13/07 $4,300,000 $3,647,636  UCH Capital
UConn Medical Group – Clinical Space Fit – Out, Storrs Center 13-003 Financially Closed 6/26/13 $4,365,000 $4,125,549  UCH Capital